level measuring instrument tools 3 axis digital screen GCS900 3D and 3 pcs 1u 500mm linear encoder for milling/lathe machines

level measuring instrument tools 3 axis digital screen GCS900 3D and 3 pcs 1u 500mm linear encoder for milling/lathe machines
  • Продавецflimmer.com
  • Список ценUS $244.75piece
  • Продажная ценаUS $244.75piece
  • ДоставкаБесплатная доставка
  • Рейтинги4,4 (907)

Oписание продукта

70-470-1um
Product Brief:
KA-300 grating ruler is a kind of grating ruler which is widely used. It has reasonable structure,
The shape design is beautiful, good rigidity, can meet the majority of general machine tool users use, use long
Degree in 70~1020mm.
1. technical parameters
1.1, pitch:
1.2, resolution:
1.3, accuracy:
1.4, range:
0.02 mm (50 line /mm)
5 um, 1um, 0.5um
+ 3 um+ 5um + 15um m/m (20 + 0.1 C)
30~3000mm
1.5, moving speed: high speed ruler 120 m/min (need to be customized)
Ordinary ruler 60m/min
1.6, power supply:
+5V + 5%, 80mA
1.7, the length of the cable: Standard 3M (special length can provide according to the needs of the user)
1.8, working temperature: 0~45
1.9, plug foot instructions:
DB9-37-3
1) suitable for: 9 core socket RS-422 signal output.
-3
 
2) suitable for: 9 core socket TTL signal output.
TTL--3
FG: shielded metal case
3) suitable for: 7 core socket TTL signal output:
7TTL-3
4.1 mounting dimensions
Outline size of KA-300 grating ruler
KA3002
L0 is the effective measuring length of the ruler; L1 is the size of the mounting hole of the ruler; L2 is the size of the ruler.
-1um-1
-1
-2
KA3005KA3001KA3004KA3002KA3003
-1

 

about the payment

1. orders are treated after verification of payment timely.

2. full payment must be made within 7 days after your order, or order is unacceptable or canceled by the system.

3. make sure that you have completed all the details such as contact person, address, post code and telephone number of the customer by the information.

shipment and delivery

1. singapore post, about 15 to 35 days to arrive.

2. china post air mail, about 15 to 90 days to get there.

3. dhl: about 5 to 15 days to arrive

4. ems about 7 - 15 days to arrive

comments

1. before the buyer confirmation after the receipt of the goods would be greatly appreciated.

2. your feedback is very important to the development of the \'s development, we sincerely invite you to leave positive feedback for us, if you are satisfied with our product and service. you just take a minute, but it has the extremely vital significance, one for us.

3. please contact us before leaving negative or neutral feedback, no matter what. we will work with you to solve all the problems.

our aim is customer satisfaction. thank you for your understanding